RISC-V Summit Europe
RISC-V Summit Europe 2026
The completed June 8-12, 2026 RISC-V Summit Europe in Bologna, with core summit sessions June 9-11 and Developer Workshops on June 8. SemiTO-V documented a limited Developer Zone RISC-V FPGA badge project prepared for the event, while delivery/receipt and exact final production-revision evidence remain incomplete.
Palazzo dei Congressi, Piazza della Costituzione 4/A, Bologna, Italy · Italy · 2026
documented hardware core
SemiTO-V identifies an RP2350 microcontroller and GOWIN GW1N-9 FPGA for the badge. The record does not infer unlisted peripherals, power behavior, safety limits, complete bill of materials, or exact population of every physical unit.
Compatibility: SemiTO-V RISC-V FPGA Badge
firmware reference links
The README points to pico2-editor and riscv-badge-displaylib. This record preserves their public-reference role without asserting version parity, a released binary, a deployed event image, programming steps, support ownership, or a recovery procedure.
Compatibility: riscv-fpga-badge-2026 README
hardware source archive
The repository README identifies KiCad 10 and the archive exposes native PCB and schematic files. The open source tree is valuable documentation, but it is not a substitute for a reconciled physical production revision, assembly record, electrical-safety assessment, or delivery ledger.
Compatibility: riscv-fpga-badge-2026 repository
high-level firmware capability
The team says the custom firmware includes a default RV32I core. This is recorded as high-level source context only, without operational FPGA configuration, programming, debugging, execution, or security claims.
Compatibility: SemiTO-V RISC-V FPGA Badge
limited event initiative
SemiTO-V stated it would bring 25 badges to the Developer Zone workshop and later reported a logistics problem that prevented intended June 8 distribution. The sources establish a limited 25-unit Developer Zone badge run in planning and a real physical-board project, not a completed allocation ledger, attendee-wide issue, or confirmed recipient count.
Compatibility: RISC-V Summit Europe 2026 Developer Zone
revision boundary
Version 1.6 fixes listed in the August source commit demonstrate that the public design continued after the June summit. The current post-event V1.6 KiCad revision is therefore not presented as a photograph, render, or authoritative specification of every physical summit badge.
Compatibility: riscv-fpga-badge-2026 Version 1.6
final hardware, power, and electrical-safety gap · public source archive review · native source visible; production/safety evidence unrecovered
The catalogue preserves the source-backed design trail without calling it a fabrication recipe, tested device specification, safety assessment, or compatibility guarantee.
firmware release and deployed-build gap · README and repository-state review · public references visible; event build unrecovered
The record describes public firmware context at a high level without presenting any current source checkout as deployed, supported, verified, or suitable for operation.
individual manufacturing and delivery-role boundary · named design and production-context sources · team/design credits and named production partner recorded; role allocation incomplete
The dossier credits named contributors and the stated production partner without inferring sole authorship, manufacture responsibility, fulfilment ownership, product-support duty, or image authority.
license, sponsorship, and event-endorsement boundary · README and team-source statements · hardware-license and named-sponsor claims recorded narrowly
The catalogue links the source-license and sponsorship context while keeping organizer ownership, attendee credential status, trademark/endorsement scope, physical-delivery responsibility, and image rights separate.
limited Developer Zone allocation and fulfilment gap · primary team event updates · 25 boards planned; logistics delay published; recipient outcome unrecovered
The catalogue does not turn a limited planned workshop allocation into proof that all 25 boards, all workshop participants, or all summit attendees received a badge.
missing rights-cleared image · local project policy and source-revision review · needs a rights-cleared, event-unit-specific original or upstream render
The record remains source-backed and image-free rather than copying repository renders, team social media, event media, screenshots, logos, or approximate/generated imagery.
summit prototype and post-event source-revision boundary · primary team statement and dated repository history · physical initiative established; exact current-source-to-unit mapping unrecovered
Current open design sources are linked for research but are not represented as the definitive exact event-unit design, final production revision, or a factual image of every distributed unit.