BSides Greenville
BSides Greenville 2023
The October 28, 2023 Greenville Security BSides conference. Its public event listing and a contemporaneous conference announcement document Circuit Board Medics-led soldering that transformed conference badges into Wi-Fi analyzers; an attendee later reported making one. The reviewed sources do not identify the underlying badge board, completed distribution, firmware, or a rights-cleared artifact image.
Fluor Corporation campus, Greenville, South Carolina · United States · 2023
event-programme hardware activity
The public 2023 event listing says Circuit Board Medics would help participants solder and transform their conference badge, while the contemporaneous BSidesGVL announcement says the badges could become Wi-Fi analyzers and the team would be on hand with soldering stations.
Compatibility: BSides Greenville 2023 conference-badge conversion activity only; sources do not identify the starting badge form, conversion kit, required skill, tool access, component set, output configuration, safety controls, or availability to every attendee.
post-event first-hand outcome
A public attendee activity message says the attendee made a Wi-Fi analyzer at BSidesGVL, corroborating that the advertised conversion occurred for at least one reported participant.
Compatibility: One public attendee report only; it does not establish a working specification, result verification, participant count, badge allocation, completed build rate, event-wide operation, or a security-testing capability.
badge form, distribution, and credential boundary · event-programme wording and attendee report · event-linked badge documented; form and allocation unresolved
The record remains a source-backed event artifact rather than an unsupported universal-attendee, access-control, or electronic-hardware claim.
hardware, soldering, and software archive boundary · public event and attendee-source review · conversion activity documented; technical archive not recovered
The compendium records the physical badge-conversion activity without inventing a circuit, analyzer implementation, radio behavior, data-collection practice, safe build procedure, or reproducible technical design.
missing rights-cleared image · local project policy · needs licensed original replacement
The United States record remains source-backed and image-free rather than copying source-page media, documentation screenshots, event photos, social media, placeholders, or generated approximations.
post-event source-depth boundary · public-source recovery · dated programme sources plus one profile-surfaced attendee outcome
The entry distinguishes a corroborated reported build from a comprehensive post-event technical, manufacturing, fulfillment, or image-provenance record.